All Agent Skills
41,263 results
- Foundation Stakeholder UpdateProduct on PurposeProduces async communication to stakeholders, primarily non-attendees and secondarily some attendees who want a reference. Translates meeting outcomes into what-it-means language for readers, with channel variants (slack, teams, email, notion, exec-memo) and audience variants (engineering, design, leadership, customer-facing, mixed).
- Iterate Lessons LogProduct on PurposeCreates a structured lessons learned entry for organizational memory. Use after an incident, a completed project, or a significant learning to record knowledge for future teams and initiatives. Distinct from iterate-retrospective, which facilitates the team ceremony; this skill writes the durable lessons entry that outlives it.
- Iterate Pivot DecisionProduct on PurposeDocuments a strategic pivot or persevere decision with the evidence, analysis, and rationale. Use when evaluating whether to change direction on a product, feature, or strategy based on market feedback.
- Iterate Refinement NotesProduct on PurposeDocuments backlog refinement session outcomes including stories refined, estimates, questions raised, and decisions made. Use during or after refinement to capture the results and share with absent team members.
- Iterate RetrospectiveProduct on PurposeFacilitates and documents a team retrospective capturing what went well, what to improve, and action items. Use at the end of a sprint, project, or milestone to reflect and improve team practices. To bank individual learnings into organizational memory afterward, use iterate-lessons-log.
- Measure Dashboard RequirementsProduct on PurposeSpecifies what questions a dashboard must answer and the metrics, visualizations, filters, and data sources it needs, so data teams build something that informs decisions rather than displaying numbers. Use when requesting a dashboard or formalizing ad-hoc reporting. For the event tracking that feeds the dashboard, use measure-instrumentation-spec instead; instrument first, visualize second.
- Measure Experiment DesignProduct on PurposeDesigns an A/B test or experiment with variants, success metrics, sample size, and duration for an existing hypothesis. Use when planning an experiment to validate a product change or test an assumption you have already framed. To articulate the hypothesis itself first, use define-hypothesis.
- Measure Experiment ResultsProduct on PurposeDocuments the results of a completed experiment or A/B test with statistical analysis, learnings, and recommendations. Use after experiments conclude to communicate findings, inform decisions, and build organizational knowledge.
- Measure Instrumentation SpecProduct on PurposeSpecifies what analytics events to track, when they fire, and what properties to include, as a contract between product and engineering that prevents undertracked features. Use before engineering builds a feature or when auditing existing tracking for gaps. For the dashboard built on top of these events, use measure-dashboard-requirements instead.
- Measure Okr GraderProduct on PurposeScores completed OKR sets at cycle close with KR-level scoring per the canonical OKR type enum (committed | aspirational | learning | operational_health | compliance_or_safety), committed-vs-aspirational interpretation, evidence quality assessment, learning synthesis, and next-cycle recommendations.
- Measure Survey AnalysisProduct on PurposeAnalyze survey results into actionable PM insights. Produces persona segmentation, hypothesis validation status, thematic clustering of open-text responses, statistical confidence labels, prioritized recommendations, and what-NOT-to-conclude warnings. Refuses to overstate statistical significance from weak samples or biased instruments.
- product-on-purpose/pm-skillsProduct on PurposeCollection68 plug-and-play, best-practice product management skills for AI agents: 30 Triple Diamond phase + 11 foundation + 12 utility + 15 tool (Foundation Sprint + Design Sprint). Plus 6 sub-agents, workflows, 200+ output samples, guides, and CI-enforced contracts. Apache 2.0.
- Tool Design Sprint BriefProduct on PurposePre-sprint brief that locks challenge, sprint questions, team and role assignments, customer recruiting plan, prototype medium, interview format, logistics, and success criteria before Monday of a Design Sprint. Use after the readiness verdict is Go and before Monday begins. Produces a two-page artifact the team and Decider sign off on as the contract for the next five days.
- Tool Design Sprint Decide And StoryboardProduct on PurposeDay 3 (Wednesday) move of a Design Sprint that runs the art museum layout, heat map, speed critique, straw poll, Decider supervote, rumble-vs-all-in-one decision, and the storyboard that drives Thursday's prototype build. The most decision-heavy day of the sprint. Use Wednesday morning and afternoon after Tuesday's sketches are collected and attribution-stripped.
- Tool Design Sprint Map And TargetProduct on PurposeDay 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked.
- Tool Design Sprint Prototype PlanProduct on PurposeDay 4 (Thursday) move of a Design Sprint that produces the planning artifact for the day. Output covers the prototype role plan (Maker, Stitcher, Writer, Asset Collector, Interviewer), prototype brief (what to build, fidelity bar, time allocation per role), canonical Five-Act Interview script (Welcome, Context, Intro, Tasks, Debrief), trial-run checklist, and Friday participant confirmation…
- Tool Design Sprint ReadinessProduct on PurposePre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities.
- Tool Design Sprint SketchProduct on PurposeDay 2 (Tuesday) move of a Design Sprint that structures lightning demos and the four-step independent solution sketch protocol (Notes, Ideas, Crazy 8s, Solution Sketch). Each team member produces one solution sketch individually; the skill orchestrates the day but does not author the sketches themselves. Use Tuesday morning after Monday's target moment is locked.
- Tool Design Sprint Test And ScoreProduct on PurposeDay 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed patterns, hot takes from each team member, and the Decider summary (build, iterate, pivot, or stop, plus highest-confidence learning, most important revision, and next artifact).
- Tool Foundation Sprint Approach OptionsProduct on PurposeDay 2 morning move of a Foundation Sprint. Forces generation of 3 to 7 candidate approaches as one-page summaries before the team converges on a top bet. Use after Day 1 is signed and before Magic Lenses on Day 2 afternoon. Enforces a minimum of 3 approaches to prevent first-idea anchoring. Each approach summary names what it is, why it serves the differentiators, and includes a simple visual.
- Tool Foundation Sprint BasicsProduct on PurposeDay 1 morning move of a Foundation Sprint. Forces explicit team choices on target customer, important problem, team advantage, and competitors and alternatives. Produces a single coherent strategic frame that becomes the input to Day 1 afternoon Differentiation. Use after the sprint brief is signed and Day 1 morning is scheduled. Bundled artifact, not four separate decisions.
- Tool Foundation Sprint BriefProduct on PurposePre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the readiness verdict is Go and before the sprint begins. Produces a one-page artifact the team and Decider sign off on as the contract for the next two days.
- Tool Foundation Sprint DifferentiationProduct on PurposeDay 1 afternoon move of a Foundation Sprint. Converts the morning's Basics frame into a defensible strategic position by scoring differentiator candidates against customer-perceived value, choosing two committed differentiators, plotting alternatives on a 2x2 chart, writing decision principles, and producing a one-page Mini Manifesto.
- Tool Foundation Sprint Founding HypothesisProduct on PurposeDay 2 end capstone move of a Foundation Sprint. Compresses the sprint's full strategic frame into a single canonical sentence (the Founding Hypothesis) plus an assumption scorecard, why-we-believe, what-could-prove-us-wrong, and recommended next validation step. Use after Magic Lenses is signed. Strict canonical template; paraphrase is not accepted in v0.1.0.